Lendlease engaged Delta Group to undertake early works civil construction of HV Trench Works in preparation for the redevelopment of the Former Royal Adelaide Hospital (Lot Fourteen) site in central Adelaide, South Australia.

  • HV Trench Works
  • Installing Switching Cubicle & Transformer for SA Power Network
  • Installing pre-cast mechanical culverts
  • Asphalt works
  • Ground slab preparation
  • Civil & Hydraulic works
  • Installation of Switching Cubicle and Transformer within time and budget
  • Installation of pre-cast mechanical culverts

Key project statistics included:

  • Installing pre-cast mechanical culverts 2.1 m wide and 1.8 m high
  • Installation of in-situ culverts in a congested location
  • Laying 150 lineal meters of HV conduits.