St Kilda Transmission Station

Hansen Yuncken

Sector: Industrial, Renewables & Transmission

  • >10%Indigenous Participation
  • 11,000m²Asphalt
  • 200,000tBulk Excavation
  • >3kmHaul Road & Kerbing
  • >1.2kmStormwater Pipe
  • >12,000Total Workhours
  • Enviro Controls & Monitoring
  • Materials Solution Management
  • Cultural & Heritage Surveying
  • Bulk & Detailed Earthworks
  • Haul Road Construction & Management
  • Backfilling & Compaction

Unique Attributes

  • Significant cultural heritage elements, with works led by Widi Ngaruwa (supported by Delta Group)
  • Bulk fill for pavement consrtruction
  • Haul road and kerbing construction, including asphalt – installation of 300-450mm diameter stormwater pipe

Key Challenges

  • Installation of 54 precast stormwater pits, both with grated inlet and steel gatic lids
  • Installation of various stormwater treatment systems – gross pollutant systems and hydrocarbon separators
  • Installation of large below ground concrete rainwater storage tanks, involving deep/detailed excavations, ground water dewatering, and crane lifts
  • CCTV camera inspection of all installed infrastructure
  • DELTA Group - Projects