Royale Gold Coast

Hutchinson

Sector: Urban, Residential

  • >45,000Total Workhours
  • 35,000m³Sand Excavated
  • 7,500m³Piling Spoil Excavated
  • >3,300Heavy Vehicle Movements
  • Stakeholder Engagement
  • Traffic Management
  • Piling Platform & Proof Digging
  • Bulk Earthworks
  • Loading Platforms
  • Core Retention
  • Detailed Earthworks
  • Site Dewatering
  • Crane Base Construction
  • Mechanical Demolition
  • Cranage & Rigging
  • Temp Works Engineering
  • Enviro Monitoring & Controls
  • Social Procurement
  • Waste Transfer
  • Concrete Recycling
  • Steel Recycling
  • Permits & Authorities
  • Water Sampling
  • Groundwater & Leachate
  • Surveys – Geotechnical

Unique Attributes

  • Civil works programme to support construction of 38 storey six-star luxury residential apartment tower and four level basement
  • Beachfront site requiring extensive dewatering program, including novation to client once programme delivered
  • Deployment of 35t telescopic excavator
  • Demolition of existing Diaphragm Wall at beachside elevation and installation of new Sea Wall structure

Key Challenges

  • Restricted and heavily congested site access, with load out coordinated onto arterial thoroughfare
  • Challenging sub-surface conditions, including sand and undertaking excavations around multiple doughnut slabs and steel props
  • DELTA Group - Projects