Delta Group’s largest ever internal strip out project – 53 levels across three separate high rise towers, including heritage listed internal and external facades
Robotic demolition methodology employed for internal stair case demolition
Engineered sequencing of four level basement demolition and 22t excavator working internally – post tensioned beams and slab
Key Challenges
Fully operational ANZ Bank and Basement Safe Deposit Box facility connected to the site. Strict (CoM Sensitive Zone 1) emissions, vibration and noise controls were in place, with Temporary Works engineering overcoming floor loading restrictions as a result of timber and precast flooring from the original 1920s construction
Internal Birdcage scaffolding within Campiellos and Atriums
Partial Capping Beam demolition and Temporary Propping