Pedler Creek Bridge

Fleurieu Connections Alliance

Sector: Urban, Public Infrastructure

  • >10,000Total Workhours
  • 2,000tConcrete Recycled
  • 250tSteel Recycled
  • 15 x 15tGirders Removed in 5 Days
  • 30Workforce at Peak Including 10 Specialist Trades
  • Ground Improvement
  • Temp Works Engineering
  • Pad Footings
  • Site Dewatering
  • Crane Base Construction
  • Slope Stabilisation
  • Hazmat Removal
  • Manual Demolition
  • Mechanical Demolition
  • Cut & Lift Demolition
  • Traffic Management
  • Cranage & Rigging
  • Propping & Bracing
  • Enviro Monitoring & Controls
  • Stakeholder Engagement
  • Skip Bin Hire
  • Waste Transfer
  • Concrete Recycling
  • Steel Recycling
  • Permits & Authorities
  • Bulk Earthworks
  • Site Remediation
  • Backfilling
  • Compaction
  • Drainage Solutions
  • Surveys – Geotechnical
  • Security
  • Temp Fencing

Unique Attributes

  • Installation of Megashore Prop and Saddle Brackets to secure girders to pipers
  • Deployment of 400t crane with mega-wing attachment to remove steel girders
  • Demolition of Bridge Deck with two 40t Excavators and felling of concrete piers
  • Removal of Dampener Pipe with two mobile cranes on bridge deck
  • Installation of temporary props using crane on bridge deck

Key Challenges

  • Managing works programme to accommodate adverse/extreme weather conditions
  • Temporary works engineering to ensure global stability of the bridge throughout works
  • Safe release of stored energy in Dampener Pipes during removal