Next DC S3 Data Centre

Next DC

Sector: Urban, Commercial

  • >42,000Total Workhours
  • 485+Temporary Anchors
  • 24,000tContaminated Spoil Removed
  • 175,000tVENM (Shale) Excavated for Manufacture of Bricks
  • >1,300tSteel Reinforcement
  • >6,000Heavy Vehicle Movements
  • Stakeholder Engagement
  • Permits & Authorities
  • Traffic Management
  • Surveys – Geotechnical
  • Enviro Monitoring & Controls
  • Piling Platform & Proof Digging
  • Retention Piles
  • Ground Improvement
  • Site Remediation
  • Loading Platforms
  • Pad Footings
  • Pile Caps
  • Site Dewatering
  • Inground Services
  • Hardstand Construction
  • Stormwater & Drains
  • Temp Works Engineering
  • Bulk Earthworks
  • Detailed Earthworks
  • Retaining Walls
  • Backfilling
  • Compaction
  • Compliance Auditing
  • & Reporting
  • Engineering (3rd Party)

Unique Attributes

  • Site remediation including waste classification and the removal of Asbestos Contaminated Material and General Solid Waste from site
  • Installation of formwork, steel-fixing and pouring concrete to pad footings, strip footings, raft slabs and lift cores
  • Recycling of VENM material for manufacture of bricks

Key Challenges

  • Decommissioning and removal of redundant and live utilities
  • Design and construction of retention system including piled retaining wall, shotcrete, capping beam and installation of temporary anchors
  • Excavation and installation of in-ground hydraulic services
  • Sydney Water sewer diversion works
  • DELTA Group - Projects