880tHazmat Removed, Including Mercury and Activated Black Carbon
16,000tBricks Recovered for Re-use
Live Environments
Enviro Controls & Monitoring
Mechanical Demolition
Cranage & Rigging
Long Reach Demolition
Concrete
Waste Transfer
Unique Attributes
Ex-munitions manufacturing site involved various risks associated with residual quantities of explosives and propellants, as well as asbestos contaminated materials – requiring significant water suppression measures and conservative mechanical demolition methods
Recycling and reuse of water to reduce impacts on local flora and fauna
New methodology developed to test rubble for explosives contamination prior to any disposal
Site specific water filtration system contained risk of hazmat breaching into the storm water drains that flowed directly into nearby Murray River
Key Challenges
Structural demolition of 43 redundant buildings and supporting infrastructure, including two 12m high asbestos contaminated brick boilers (inside boiler house) and two 36m high chimney stacks
Project undertaken at height of COVID-19 pandemic involving strict cross-border controls (between Victoria and NSW)