Morwell River Diversion

ENGIE

Sector: Industrial, Energy

  • >85,000m³Bulk Excavations
  • 71GLCapacity to Accommodate Future Weather Events
  • 18+Heavy Plant Fleet – Excavators, Moxies, Dozers, Compactors, Rollers
  • Enviro Controls & Monitoring
  • Materials Solution Management
  • Geotechnical Analysis & Surveying
  • Bulk & Detailed Earthworks
  • Ground Improvement
  • Slope Stabilisation
  • Backfilling & Compaction

Unique Attributes

  • Following significant rain events that threatended the stability of the Yallourn Open Pit Coal Mine walls (that had previously collapsed in 2007 and 2012), the Victorian Government declared a State Energy Emergency that facilitated approval of the diversion of the Morwell River into the redundant Hazelwood Mine pit

Key Challenges

  • Construction of Open Earth Drains, including Rock Spalls (erosion control), Plugs and Energy Dissipator at the bottom of Hazelwood Mine batters
  • Construction of Concrete Pipe Crossings, including Head Walls, Concrete Pipe installation, Rock Spalls and Road Crossings
  • Construction of Concrete Drain, including Concrete Baffles and Stilling Basin
  • Construction of Weir to halt flow of river toward Yallourn