>35,000tCoode Island Silt & Pass Excavated & Removed
>1,200tCategory C Asbestos Contaminated Spoil
2,500m³High Strength Concrete Poured
Piling Platform & Proof Digging
Ground Improvement
Bulk Earthworks
Ground Anchors
Soil Nails
Propping
Temp Works Engineering
Foundation Piles
Detailed Earthworks
Pad Footings
Pile Caps
Lift Rafts
Crane Base Construction
Slab Preparation
Waterproofing
Hardstand Construction
Traffic Management
Cranage & Rigging
Enviro Monitoring & Controls
Materials Solution Management
Permits & Authorities
Retention Systems
ACM Abatement & Removal
Stakeholder Engagement
Unique Attributes
Staged early works to support staged construction of six residential and commercial towers up to 225m high across 20,000m2+ site footprint
Innovative methodologies employed to overcome challenging geotech conditions, including heavy lifts in/on poor (and unstable) ground
Key Challenges
Excavation and construction of core rafts in challenging Coode Island Silt and poor ground conditions up to 7m below ground and 6m below the water table
Ground water management and site dewatering – mandatory that existing levels were maintained due to adjacent structures/towers as well as major transport infrastructure within metres of the site (CityLink Tunnel)