Melbourne Square

Multiplex

Sector: Urban, Residential

  • >50,000tBulk Excavations
  • >35,000tCoode Island Silt & Pass Excavated & Removed
  • >1,200tCategory C Asbestos Contaminated Spoil
  • 2,500m³High Strength Concrete Poured
  • Piling Platform & Proof Digging
  • Ground Improvement
  • Bulk Earthworks
  • Ground Anchors
  • Soil Nails
  • Propping
  • Temp Works Engineering
  • Foundation Piles
  • Detailed Earthworks
  • Pad Footings
  • Pile Caps
  • Lift Rafts
  • Crane Base Construction
  • Slab Preparation
  • Waterproofing
  • Hardstand Construction
  • Traffic Management
  • Cranage & Rigging
  • Enviro Monitoring & Controls
  • Materials Solution Management
  • Permits & Authorities
  • Retention Systems
  • ACM Abatement & Removal
  • Stakeholder Engagement

Unique Attributes

  • Staged early works to support staged construction of six residential and commercial towers up to 225m high across 20,000m2+ site footprint
  • Innovative methodologies employed to overcome challenging geotech conditions, including heavy lifts in/on poor (and unstable) ground

Key Challenges

  •  Excavation and construction of core rafts in challenging Coode Island Silt and poor ground conditions up to 7m below ground and 6m below the water table
  • Ground water management and site dewatering – mandatory that existing levels were maintained due to adjacent structures/towers as well as major transport infrastructure within metres of the site (CityLink Tunnel)
  • DELTA Group - Projects