Herald & Weekly Times

Next DC

Sector: Industrial, Manufacturing

  • >9,500Total Workhours
  • 1,2000tScrap Steel Processed
  • 28,600tConcrete Recycled
  • Mechanical Demolition
  • Temp Works Engineering
  • Long Reach Demolition
  • Enviro Controls & Monitoring
  • Ferrous Steel
  • Non Ferrous Steel
  • Concrete
  • Materials Solution Management
  • Waste Transfer

Unique Attributes

  • Demolition of major News Limited printing facility
  • Demolish Reel Store building to ground level and Cable Stayed roof structure to basement level – from height of 12m
  • Demolish multi-storey 21m high plant room
  • Site specific heavy plant fleet – two 87t excavators, as well as a 75t long reach excavator and 67t, 47t and two 35t excavators

Key Challenges

  • Significant weather events on large (and exposed) light industrial site
  • Numerous (night time) security breaches
  • Contaminated water requiring on-site treatment
  • Efficient on-site separation of C&D waste to maximise resource recovery