Instagram
YouTube
LinkedIn
About
About Delta Group
Company Profile
Sustainability
News & Media
Capabilities
Contracting Capabilities
Civil Construction
Demolition
Piling
Landscaping
Environmental
Waste Management & Recycling
Heavy Plant Hire
Materials Solution Management
Sectors
Sector Capabilities
Urban
Public Infrastructure
Commercial
Residential
Health & Aged Care
Retail & Hospitality
Industrial
Renewables & Transmission
Energy
Oil & Gas
Mining & Resources
Manufacturing
Projects
Businesses
Our Businesses
Delta Group
Delta Recycling
Delta Rent
BRC Piling & Foundations
Browns Piling
CMA Contracting
Eastern Plant Hire
Earth Solutions Group
Grange Environmental
SKIPZ
Whelan the Wrecker
Widi Ngaruwa
Careers
Careers Overview
Job Vacancies
Cadet Program
Graduate Program
Contact
Dept of Lands Building Phase 2
Built
Sector: Urban, Retail & Hospitality
>60
Total Workforce at Peak
>30
Specialist Trades at Peak
>1,500t
Sandstone Excavated
>2,000t
Backfilling (Stabilised Sand)
>2,000t
GSW Removed
226
Rock Anchors
1,000m²
Shotcrete
Enviro Monitoring & Controls
Shotcrete Walls
Ground Anchors
Temp Works Engineering
Detailed Earthworks
Permits & Authorities
Hazmat Removal
Manual Demolition
Mechanical Demolition
Robotic Demolition
Cut & Lift Demolition
Traffic Management
Heritage Protection
Cranage & Rigging
Propping & Bracing
Live Environments
Waste Transfer
Concrete Recycling
Steel Recycling
Retaining Walls
Stakeholder Engagement
Unique Attributes
Detailed excavation and retention works to enable tunnelling works contractor within confined space environment
Complex demolition methodology for staging and lifting roof structure with tower crane
Underpinning heritage structure in preparation for hydraulic jacking works
Onsite laboratory for sampling, testing and analysis of air and lead monitoring – including daily clearance certifications to re-occupy work areas
Robotic demolition methodologies
Key Challenges
Removal of lead dust and stripping of redundant services – ceiling corridor voids <1.2m crawl space
Installation of horizontal steel tie rods and core drilling 700mm diameter core to access internal corridors
Strict vibration and deflection monitoring controls to protect and retain heritage listed structural elements
Concurrent demolition, civil, tunnelling and remediation works – involving multiple fronts and work crew
×
←
→