Balmoral Quay

Balmoral Quay Pty Ltd

Sector: Urban, Residential

  • NilMarine & Environmental Impacts
  • 400mRock Sea Wall & Rockway
  • 30Berth Floating Marina Construction
  • >7,500m³Imported Sand
  • 65mBox Culvert Storm Water Extension
  • Piling Platform & Proof Digging
  • Retention Piles
  • Ground Improvement
  • Capping Beams
  • Ground Anchors
  • Foundation Piles
  • Detailed Earthworks
  • Inground Services
  • Waterproofing
  • Slope Stabilisation
  • Stormwater & Drains
  • Roads & Pavements
  • Kerbs
  • Traffic Management
  • Temp Works Engineering
  • Enviro Monitoring & Controls
  • Stakeholder Engagement
  • Materials Solution Management
  • Permits & Authorities
  • Site Preparation
  • Bulk Earthworks

Unique Attributes

  • Site remediation and rehabilitation, including excavation and disposal of marine sediment and complete renourishment of Rippleside beach for public access/use
  • 65m extension of the existing box culvert storm water into Corio Bay, including a custom designed in situ waste management process for excavation and transport of contaminated marine sediment

Key Challenges

  • Design and construction of rock (sea) wall – 400m revetment and walkway
  • Refurbishment of existing pier structure as well as design and construction of a 30 berth floating marina facility
  • Design and construction of a timber groyne to support and protect the new revitalised shoreline
  • Import and placement of 7,500 cubic metres of sand to renourish and re-shape Rippleside beach – extending 20m into Corio Bay with a 1-in-10 gradient beneath the surface to the natural seabed