Instagram
YouTube
LinkedIn
About
About Delta Group
Company Profile
Sustainability
News & Media
Capabilities
Contracting Capabilities
Civil Construction
Demolition
Piling
Landscaping
Environmental
Waste Management & Recycling
Heavy Plant Hire
Materials Solution Management
Sectors
Sector Capabilities
Urban
Public Infrastructure
Commercial
Residential
Health & Aged Care
Retail & Hospitality
Industrial
Renewables & Transmission
Energy
Oil & Gas
Mining & Resources
Manufacturing
Projects
Businesses
Our Businesses
Delta Group
Delta Recycling
Delta Rent
BRC Piling & Foundations
Browns Piling
CMA Contracting
Eastern Plant Hire
Earth Solutions Group
Grange Environmental
SKIPZ
Whelan the Wrecker
Widi Ngaruwa
Careers
Careers Overview
Job Vacancies
Cadet Program
Graduate Program
Contact
Griffith University Nathan Campus
Lendlease
Sector: Urban, Commercial
50,000+
Total Work Hours
5,000m2
Full Perimeter Scaffold Encapsulation
93%
Resource Recovery Rate
11,000t
Concrete Recycled
Surveys – Geotechnical
Piling Platform & Proof Digging
Ground Improvement
Bulk Earthworks
Site Remediation
Site Dewatering
Inground Services
Slope Stabilisation
Stormwater & Drains
Roads & Pavements
Kerbs
Permits & Authorities
Hazmat Removal
Strip Out
Mechanical Demolition
Long Reach Demolition
Scaffold
Hoardings
Traffic Management
Cranage & Rigging
Propping & Bracing
Temp Works Engineering
Enviro Monitoring & Controls
Stakeholder Engagement
Live Environments
Social Procurement
Waste Transfer
Concrete Recycling
Steel Recycling
Green Star Reporting
Unique Attributes
Integrated demolition, recycling and civil works program – consecutive and concurrent programming and sequencing
Demolition of 5,000m2 structure – including hazmat removal – within a live university campus
Heavy scaffold encapsulation as a result of friable asbestos contamination – full exterior of structure and weighing 500 tonnes
Improvised ground gutter system to control run off
Third party geotech and structural engineering for deployment of heavy machines and limited ground bearing capacity of campus road infrastructure
Key Challenges
Live university environment – including five buildings and food court
Restricted site access limited deployment of heavy plant – extensive traffic management
Enviro controls – particularly dust control measures and monitoring; water run off measures to protect adjacent creek
×
←
→
Back to PROJECTS