Instagram
YouTube
LinkedIn
About
About Delta Group
Company Profile
Sustainability
News & Media
Capabilities
Contracting Capabilities
Civil Construction
Demolition
Piling
Landscaping
Environmental
Waste Management & Recycling
Heavy Plant Hire
Materials Solution Management
Sectors
Sector Capabilities
Urban
Public Infrastructure
Commercial
Residential
Health & Aged Care
Retail & Hospitality
Industrial
Renewables & Transmission
Energy
Oil & Gas
Mining & Resources
Manufacturing
Projects
Businesses
Our Businesses
Delta Group
Delta Recycling
Delta Rent
BRC Piling & Foundations
Browns Piling
CMA Contracting
Eastern Plant Hire
Earth Solutions Group
Grange Environmental
SKIPZ
Whelan the Wrecker
Widi Ngaruwa
Careers
Careers Overview
Job Vacancies
Cadet Program
Graduate Program
Contact
Pedler Creek Bridge
Fleurieu Connections Alliance
Sector: Urban, Public Infrastructure
>10,000
Total Workhours
2,000t
Concrete Recycled
250t
Steel Recycled
15 x 15t
Girders Removed in 5 Days
30
Workforce at Peak Including 10 Specialist Trades
Ground Improvement
Temp Works Engineering
Pad Footings
Site Dewatering
Crane Base Construction
Slope Stabilisation
Hazmat Removal
Manual Demolition
Mechanical Demolition
Cut & Lift Demolition
Traffic Management
Cranage & Rigging
Propping & Bracing
Enviro Monitoring & Controls
Stakeholder Engagement
Skip Bin Hire
Waste Transfer
Concrete Recycling
Steel Recycling
Permits & Authorities
Bulk Earthworks
Site Remediation
Backfilling
Compaction
Drainage Solutions
Surveys – Geotechnical
Security
Temp Fencing
Unique Attributes
Installation of Megashore Prop and Saddle Brackets to secure girders to pipers
Deployment of 400t crane with mega-wing attachment to remove steel girders
Demolition of Bridge Deck with two 40t Excavators and felling of concrete piers
Removal of Dampener Pipe with two mobile cranes on bridge deck
Installation of temporary props using crane on bridge deck
Key Challenges
Managing works programme to accommodate adverse/extreme weather conditions
Temporary works engineering to ensure global stability of the bridge throughout works
Safe release of stored energy in Dampener Pipes during removal
×
←
→