Demolition of Gyatory Cone crusher, concrete structure and delivery bridge
Heavily reinforced large concrete structure standing 20m in height designed to support 110t fully loaded dump trucks, with steel bridge girders and reinforced deck attached to an abutment on adjacent embankment
Utilisation of Delta Rent Dump trucks working for ADBRI to haul the processed concrete and steel out of the side of the mine pit to area for standard load out and semi truck access
Key Challenges
49t Excavator working on suspended delivery bridge to demolish the top of the crusher down to height suitable for 87t excavator
Induced felling of 200t Cone Bowl
Processing of 400mm thick plate steel from Cone Crusher using gas axe