Instagram
YouTube
LinkedIn
About
About Delta Group
Company Profile
Sustainability
News & Media
Capabilities
Contracting Capabilities
Civil Construction
Demolition
Piling
Landscaping
Environmental
Waste Management & Recycling
Heavy Plant Hire
Materials Solution Management
Sectors
Sector Capabilities
Urban
Public Infrastructure
Commercial
Residential
Health & Aged Care
Retail & Hospitality
Industrial
Renewables & Transmission
Energy
Oil & Gas
Mining & Resources
Manufacturing
Projects
Businesses
Our Businesses
Delta Group
Delta Recycling
Delta Rent
BRC Piling & Foundations
Browns Piling
CMA Contracting
Eastern Plant Hire
Earth Solutions Group
Grange Environmental
SKIPZ
Whelan the Wrecker
Widi Ngaruwa
Careers
Careers Overview
Job Vacancies
Cadet Program
Graduate Program
Contact
Melbourne Street
ARIA Property Group
Sector: Urban, Residential
3,000t
ACM Removed
>90%
Resource Recovery Rate
125
Retention & Foundation Piles
480
Ground Anchors
65,000m³
Spoil Removed
3,470m²
Shotcrete Walls
5,750
Heavy Vehicle Movements
>97,000
Total Workhours
Piling Platform & Proof Digging
Retention Piles
Ground Improvement
Capping Beams
Bulk Earthworks
Site Remediation
Loading Platforms
Shotcrete Walls
Ground Anchors
Underpinning
Foundation Piles
Detailed Earthworks
Pad Footings
Pile Caps
Site Dewatering
Inground Services
Slab Preparation
Hardstand Construction
Retaining Walls
Stormwater & Drains
Kerbs
Hazmat Removal
Strip Out
Manual Demolition
Mechanical Demolition
Scaffold
Hoardings
Traffic Management
Security
Heritage Protection
Services
Cranage & Rigging
Propping & Bracing
Temp Works Engineering
Enviro Monitoring & Controls
Stakeholder Engagement
Live Environments
Social Procurement
Waste Transfer
Concrete Recycling
Steel Recycling
Green Star Reporting
Permits & Authorities
Backfilling
Surveys – Geotechnical
Unique Attributes
Integrated demolition and civil works programme to deliver 7 storey deep basement carpark structure
Protection and retention of ‘live’ heritage structures
Temp works engineering solutions, including slab/ footings/scaffold for fire exit and underpinning of heritage structure
‘Down-the-hole-hammer’ drilling methodology to expedite piling programme in hard rock geotech conditions
Key Challenges
Demolition and reconfiguration of heritage structure fire exit and diversion of sewer to facilitate piling works
Sequencing of ACM removal to enable concurrent work programmes
Extensive stakeholder management – local council, regulators, residents and businesses
Temp works engineering solutions to excavate, expose and support batter under adjacent residential high rise structure
×
←
→