The Walk Arcade

Steadfast Capital

Sector: Urban, Retail & Hospitality

  • 9,500tC&D Waste Removed
  • >94%Resource Recovery Rate
  • 500tScrap Steel Processed
  • >650Heavy Vehicle Movements
  • 2,485m²Heritage Facade Retained
  • 10,500m²Scaffold
  • Stakeholder Engagement
  • Temp Works Engineering
  • Hazmat Removal
  • Strip Out
  • Manual Demolition
  • Mechanical Demolition
  • Long Reach Demolition
  • Scaffold
  • Hoardings
  • Traffic Management
  • Services
  • Enviro Monitoring & Controls
  • Live Environments
  • Skip Bin Hire
  • Waste Transfer
  • Concrete Recycling
  • Steel Recycling
  • Permits & Authorities

Unique Attributes

  • Design and installation of internal (heritage) facade retention system to protect four of seven structures, including full perimeter retention piling and internal retention piles
  • Removal of lead paint from retained facades
  • Backfill of all basements to ground level across 3,500m2 site footprint

Key Challenges

  • Design and installation of gantries – Bourke Street and The Causeway
  • Extensive stakeholder engagement due to size and location in Melbourne CBD and adjacent to major arterial pedestrian and road thoroughfares – including Bourke Street Mall and Collins Street retail precincts
  • DELTA Group - Projects
  • DELTA Group - Projects