Site remediation and rehabilitation, including excavation and disposal of marine sediment and complete renourishment of Rippleside beach for public access/use
65m extension of the existing box culvert storm water into Corio Bay, including a custom designed in situ waste management process for excavation and transport of contaminated marine sediment
Key Challenges
Design and construction of rock (sea) wall – 400m revetment and walkway
Refurbishment of existing pier structure as well as design and construction of a 30 berth floating marina facility
Design and construction of a timber groyne to support and protect the new revitalised shoreline
Import and placement of 7,500 cubic metres of sand to renourish and re-shape Rippleside beach – extending 20m into Corio Bay with a 1-in-10 gradient beneath the surface to the natural seabed