Ballarat Base Hospital

Built

Sector: Urban, Health & Aged Care

  • >130tScaffold Erected
  • 45Total Workforce at Peak
  • 95%Resource Recovery Rate
  • 11,500tConcrete Recycled
  • >3,100Heavy Vehicle Movements
  • Hazmat Removal
  • Strip Out
  • Manual Demolition
  • Mechanical Demolition
  • Long Reach Demolition
  • Cut & Lift Demolition
  • Scaffold
  • Cranage & Rigging
  • Propping & Bracing
  • Temp Works Engineering
  • Live Environments
  • Waste Transfer
  • Concrete Recycling
  • Steel Recycling
  • Timber Recycling
  • Materials Solution Management
  • Enviro Monitoring & Controls
  • Stakeholder Engagement
  • Social Procurement

Unique Attributes

  • Demolition of multiple structures, including Boiler House – directly adjacent to live hospital and requiring separations from demolition works area
  • Ground slab back propping
  • Deployment/operation of long reach excavator with specialist attachments – as part of total 15 strong fleet of plant and equipment

Key Challenges

  • Concurrent demolition and civil construction work programmes
  • Asbestos render removal, including asbestos bubble erected off scaffold