Instagram
YouTube
LinkedIn
About
About Delta Group
Company Profile
Sustainability
News & Media
Capabilities
Contracting Capabilities
Civil Construction
Demolition
Piling
Landscaping
Environmental
Waste Management & Recycling
Heavy Plant Hire
Materials Solution Management
Sectors
Sector Capabilities
Urban
Public Infrastructure
Commercial
Residential
Health & Aged Care
Retail & Hospitality
Industrial
Renewables & Transmission
Energy
Oil & Gas
Mining & Resources
Manufacturing
Projects
Businesses
Our Businesses
Delta Group
Delta Recycling
Delta Rent
BRC Piling & Foundations
Browns Piling
CMA Contracting
Eastern Plant Hire
Earth Solutions Group
Grange Environmental
SKIPZ
Whelan the Wrecker
Widi Ngaruwa
Careers
Careers Overview
Job Vacancies
Cadet Program
Graduate Program
Contact
Esso House
Savills
Sector: Urban, Commercial
20 | 30
Total Trades | Workforce at Peak
45,000t
C&D Waste Removed
>90%
Resource Recovery Rate
>3,500
Heavy Vehicle Movements
20,000m²
Scaffold
Traffic Management
Hazmat Removal
Strip Out
Manual Demolition
Mechanical Demolition
Long Reach Demolition
Scaffold
Hoardings
Services
Cranage & Rigging
Temp Works Engineering
Enviro Monitoring & Controls
Stakeholder Engagement
Live Environments
Skip Bin Hire
Waste Transfer
Concrete Recycling
Steel Recycling
Permits & Authorities
Unique Attributes
Erection of full height 65m high perimeter scaffold – off needles
Installation and erection of Tower Crane within existing structure lift shaft
Structure consisted of full glazed facade with pre-cast perimeter columns
Key Challenges
Extensive stakeholder engagement – neighbouring five star hotel (The Langham)
Strict enviro controls – noise, vibrations, dust
Sequencing of small/mini plant to undertake floor-by-floor demolition
Heavy vehicle movements in high pedestrian traffic location and heavily congested inner city environment
×
←
→
Back to PROJECTS