Bendigo Law Courts

Court Services Victoria

Sector: Urban, Commercial

  • >32,000Total Workhours
  • 100 | 400Foundations & Retention Piles
  • 60Ground Anchors
  • >3,000m³Concrete Poured
  • >750m³Shotcrete Wall
  • >20,000m³Bulk Excavations
  • Piling Platform & Proof Digging
  • Retention Piles
  • Ground Improvement
  • Capping Beams
  • Ground Anchors
  • Temp Works Engineering
  • Foundation Piles
  • Pile Caps
  • Lift Rafts
  • Slab Preparation
  • Waterproofing
  • Traffic Management
  • Enviro Monitoring & Controls
  • Stakeholder Engagement
  • Social Procurement
  • Materials Solution Management
  • Permits & Authorities
  • Site Preparation
  • Bulk Earthworks
  • Detailed Earthworks

Unique Attributes

  • Design & Construct of retention system, comprising CFA secant pile wall paired with ground anchors
  • Construction of fully tanked basement using a 5,000M2 fully-welded PVC waterproof membrane required new techniques and methodologies; PVC waterproof membrane also acted as a vapour barrier

Key Challenges

  • Works undertaken during one of highest local rainfall periods on record
  • Construction of waterproof retention walls and basement hydrostatic slab, with full FRP package for all structural elements
  • Complex works programme (and design elements) successfully executed in regional location while achieving site specific local labour and social procurement targets