Deconstruction and demolition of Turbine Hall, Coal Bunker, Boiler Houses, 4 x 90m high Steel Stacks
On site NATA accredited laboratory for asbestos monitoring and measurement
Key Challenges
Extensive community and local stakeholder engagement as a result of acute anxiety around removal and disposal of asbestos. High level briefings with peak community lobby/activist groups
Vertical and horizontal transportation of machines, equipment and materials restricted by narrow walkways and crowded work areas
Heritage listed structures directly adjacent to major site works, as well as the age and construction of the decommissioned plant (e.g. pre Building Code)