Dept of Lands Building Phase 2

Built

Sector: Urban, Retail & Hospitality

  • >60Total Workforce at Peak
  • >30Specialist Trades at Peak
  • >1,500tSandstone Excavated
  • >2,000tBackfilling (Stabilised Sand)
  • >2,000tGSW Removed
  • 226Rock Anchors
  • 1,000m²Shotcrete
  • Enviro Monitoring & Controls
  • Shotcrete Walls
  • Ground Anchors
  • Temp Works Engineering
  • Detailed Earthworks
  • Permits & Authorities
  • Hazmat Removal
  • Manual Demolition
  • Mechanical Demolition
  • Robotic Demolition
  • Cut & Lift Demolition
  • Traffic Management
  • Heritage Protection
  • Cranage & Rigging
  • Propping & Bracing
  • Live Environments
  • Waste Transfer
  • Concrete Recycling
  • Steel Recycling
  • Retaining Walls
  • Stakeholder Engagement

Unique Attributes

  •  Detailed excavation and retention works to enable tunnelling works contractor within confined space environment
  • Complex demolition methodology for staging and lifting roof structure with tower crane
  • Underpinning heritage structure in preparation for hydraulic jacking works
  • Onsite laboratory for sampling, testing and analysis of air and lead monitoring – including daily clearance certifications to re-occupy work areas
  • Robotic demolition methodologies

Key Challenges

  • Removal of lead dust and stripping of redundant services – ceiling corridor voids <1.2m crawl space
  • Installation of horizontal steel tie rods and core drilling 700mm diameter core to access internal corridors
  • Strict vibration and deflection monitoring controls to protect and retain heritage listed structural elements
  • Concurrent demolition, civil, tunnelling and remediation works – involving multiple fronts and work crew