Sydney Metro West

Transport for NSW

Sector: Urban, Public Infrastructure

  • 53Structures Demolished
  • >112,000Total Workhours
  • >1,700Heavy Vehicle Movements
  • >40,000tConcrete Recycled
  • >17,500tBulk Excavations – Archaelogical
  • >90%Resource Recovery Rate – All Sites
  • Enviro Monitoring & Controls
  • Cultural & Heritage Protection
  • Temp Works Engineering
  • Permits & Authorities
  • Hazmat Removal
  • Strip Out
  • Manual Demolition
  • Mechanical Demolition
  • Long Reach Demolition
  • Robotic Demolition
  • Cut & Lift Demolition
  • Scaffold
  • Gantries
  • Hoardings
  • Traffic Management
  • Security
  • Heritage Protection
  • Services
  • Cranage & Rigging
  • Propping & Bracing
  • Stakeholder Engagement
  • Live Environments
  • Social Procurement
  • Waste Transfer
  • Concrete Recycling
  • Steel Recycling
  • Timber Recycling
  • Materials Solution Management
  • Site Preparation
  • Surveys – Geotechnical
  • Survey – Cultural & Heritage (incl. Archaeological)

Unique Attributes

  • Australia’s biggest public transport project – consecutive demolition works across three separate sites in Greater Western Sydney
  • Principal Contractor reporting direct to NSW Government to meet all planning and ministerial conditions of the project
  • Specialist archaeological surveys

Key Challenges

  • 22,000m2 block in the Parramatta Station site located in the CBD and consisting of 16 structures – extensive traffic management and stakeholder engagement
  • 123,000m2 Clyde Stable Yards light industrial site consisting of 18 different structures
  • 12,000m2 Westmead Station site, including residential structures and consisting of 19 properties