Instagram
YouTube
LinkedIn
About
About Delta Group
Company Profile
Sustainability
News & Media
Capabilities
Contracting Capabilities
Civil Construction
Demolition
Piling
Landscaping
Environmental
Waste Management & Recycling
Heavy Plant Hire
Materials Solution Management
Sectors
Sector Capabilities
Urban
Public Infrastructure
Commercial
Residential
Health & Aged Care
Retail & Hospitality
Industrial
Renewables & Transmission
Energy
Oil & Gas
Mining & Resources
Manufacturing
Projects
Businesses
Our Businesses
Delta Group
Delta Recycling
Delta Rent
BRC Piling & Foundations
Browns Piling
CMA Contracting
Eastern Plant Hire
Earth Solutions Group
Grange Environmental
SKIPZ
Whelan the Wrecker
Widi Ngaruwa
Careers
Careers Overview
Job Vacancies
Cadet Program
Graduate Program
Contact
Sydney Metro City – Martin Place
Transport for NSW
Sector: Urban, Public Infrastructure
>82,000
Total Workhours
>154,000t
Sandstone Excavated
>36,000
C&D Waste Removed
50+
Total Workforce at Peak
>68,000
Pedestrians Per Day Adjacent to Both Sites
>95%
Resource Recovery Rate – Both Sites
Permits & Authorities
Surveys – Geotechnical
Survey – Cultural & Heritage (incl. Archaeological)
Enviro Monitoring & Controls
Cultural & Heritage Protection
Piling Platform & Proof Digging
Retention Piles
Ground Improvement
Capping Beams
Site Remediation
Loading Platforms
Shotcrete Walls
Ground Anchors
Soil Nails
Detailed Earthworks
Pad Footings
Site Dewatering
Crane Base Construction
Inground Services
Slab Preparation
Retaining Walls
Stormwater & Drains
Security
Hazmat Removal
Strip Out
Manual Demolition
Mechanical Demolition
Long Reach Demolition
Robotic Demolition
Cut & Lift Demolition
Scaffold
Gantries
Hoardings
Traffic Management
Heritage Protection
Services
Cranage & Rigging
Propping & Bracing
Temp Works Engineering
Stakeholder Engagement
Live Environments
Waste Transfer
Concrete Recycling
Steel Recycling
Timber Recycling
Materials Solution Management
Site Preparation
Bulk Earthworks
Social Procurement
Unique Attributes
Australia’s biggest public transport project – consecutive early and enabling works for Martin Place Station South and North
Significant high rise demolition – 24 storey – and complex deep basement civil works (30m)
One of Sydney’s heaviest (and most critical) banks of gas, electricity, water and fibre optic mains infrastructure beneath/adjacent to tower
Key Challenges
Fully operational and heritage listed rail tunnels connected to basement columns of 24 storey tower, as well as within 3m of basement excavation works
Underpinning Heritage listed structure directly adjacent to civil works, including strict vibration controls
Daily monitoring and Geotechnical Mapping of over 6,000m2 of Excavated Walls
×
←
→
Back to PROJECTS